College of the Environment Graduate and Undergraduate Publications

Date Permissions Signed

3-11-2010

College Affiliation

Huxley College of the Environment

Date of Award

Winter 2010

Document Type

Environmental Impact Assessment

Department or Program Affiliation

Department of Environmental Studies

Department

Environmental Studies

First Advisor

Bodensteiner, Leo R.,1957-

Abstract

"The goal of the project is to construct a single 100-meter tall, 2.5-MW Fuhrländer wind turbine at the former Georgia-Pacific West (GP West) industrial site on the Bellingham waterfront as a component of the Port of Bellingham's revitalization project of the GP site. A wind turbine would serve as both a tangible symbol of Huxley College of the Environment's commitment to environmental stewardship and a viable energy source for the Huxley campus extension."

Type

Text

Keywords

Wind power--Environmental aspects--Washington (State)--Bellingham, Environmental impact analysis--Washington (State)--Bellingham, Water-power--Environmental aspects--Washington (State)--Bellingham

Publisher

Western Washington University

OCLC Number

607311957

Subject – LCSH

Wind power--Environmental aspects--Washington (State)--Bellingham; Environmental impact analysis--Washington (State)--Bellingham; Water-power--Environmental aspects--Washington (State)--Bellingham

Geographic Coverage

Bellingham (Wash.)

Format

application/pdf

Genre/Form

environmental impact statements

Language

English

Rights

Copying of this document in whole or in part is allowable only for scholarly purposes. It is understood, however, that any copying or publication of this document for commercial purposes, or for financial gain, shall not be allowed without the author's written permission.

Share

COinS