College of the Environment Graduate and Undergraduate Publications
Date Permissions Signed
3-11-2010
College Affiliation
Huxley College of the Environment
Date of Award
Winter 2010
Document Type
Environmental Impact Assessment
Department or Program Affiliation
Department of Environmental Studies
Department
Environmental Studies
First Advisor
Bodensteiner, Leo R.,1957-
Abstract
"The goal of the project is to construct a single 100-meter tall, 2.5-MW Fuhrländer wind turbine at the former Georgia-Pacific West (GP West) industrial site on the Bellingham waterfront as a component of the Port of Bellingham's revitalization project of the GP site. A wind turbine would serve as both a tangible symbol of Huxley College of the Environment's commitment to environmental stewardship and a viable energy source for the Huxley campus extension."
Type
Text
Keywords
Wind power--Environmental aspects--Washington (State)--Bellingham, Environmental impact analysis--Washington (State)--Bellingham, Water-power--Environmental aspects--Washington (State)--Bellingham
Publisher
Western Washington University
OCLC Number
607311957
Subject – LCSH
Wind power--Environmental aspects--Washington (State)--Bellingham; Environmental impact analysis--Washington (State)--Bellingham; Water-power--Environmental aspects--Washington (State)--Bellingham
Geographic Coverage
Bellingham (Wash.)
Format
application/pdf
Genre/Form
environmental impact statements
Language
English
Rights
Copying of this document in whole or in part is allowable only for scholarly purposes. It is understood, however, that any copying or publication of this document for commercial purposes, or for financial gain, shall not be allowed without the author's written permission.
Recommended Citation
Grow, Stephanie; Linroth, Emily; Mattioli, Peter; Trainor, Erin; and Veldman, Carrie, "Bellingham waterfront wind power proposal: environmental impact assessment" (2010). College of the Environment Graduate and Undergraduate Publications. 56.
https://cedar.wwu.edu/huxley_stupubs/56